A Bill of Quantities (BOQ) is a document which provides project specific requirement list with details such as material quantity, labor cost, equipment cost, earth work in excavation, disposal system, woodwork, and so on.

A typical BoQ consists of following details:

  • Earthwork, mud filling
  • Concrete, steel
  • Door and Window material & cost
  • Plastering
  • Flooring
  • Painting
  • Other miscellaneous details: Carving, Ceiling, Elevation treatment

 

While the rough estimates work as good indicative figures, it’s been observed that most of the times projects tend to overshoot by 25-100% of the original cost estimate. Since construction process can take from 10 months to 2 years, increase in the price of material and labor gets overlooked, effecting your overall budget.

At Apnaghar, we prepare BOQs as per standard methodologies avoiding any uncertainty that may arise due to different interpretations of the document. Our experts deliver a detailed document, outlining the total quantity of material to be used and its costs, taking into consideration any price rise in future.

Download PDF


Get Customized Plan by filling in the following Details


Name:*

Mobile No.:*

Email:*

Address:

Construction Planning Date:

Plot Location:

Plot Direction:

Plot Dimension:

Plot Area:

App Covered Area:

No. of Floors:

Other Requirment:

Select Service:
  Floor Plan with furniture Layout

 
  3D View

 
  Working Drawings (2D Elevation,Detail Drawing of Cross Sectio, Walls,Doors& Windows,toilets & Kitchen)

 
  Structure Drawings (Beam Details, Foundation Details, Foundation Plan General Arrangement of Beams and Reinforcement Details of Each Floor)

 
 Plumbing Drawing

 
 Electrical Drawing

 
 Bill Of Quantity (Estimate Cost of Construction)